01 · NAZARE
Connect data
Connect welding current, voltage, seam segments, cell alarms and fixture state to part IDs, torch service and inspection images.
Rework rises at specific seams despite the same program. Teams need evidence spanning torch condition, fixture position and part variation.

Data connections, decision rules and approved actions are designed for your equipment and operating criteria.
The production flow
01 · NAZARE
Connect welding current, voltage, seam segments, cell alarms and fixture state to part IDs, torch service and inspection images.
02 · NAZARE · Ontology
Structure part–fixture–seam relationships, torch consumable checks, fault inspection sequences and cell restart conditions.
03 · NAVIS
NAVIS links defect locations to weld segments and compares torch and fixture evidence. It requests more checks when evidence is insufficient.
↶ Keep verified outcomes and actions in NAZARE to inform the next decision.
Machine safety circuits, interlocks and operating procedures remain in place. Control requires approval and verified communication, permissions and equipment state. ML models can be added under a separate scope.
Operators
Management & production leads
Establish a baseline and compare under matching product and operating conditions. Outcomes depend on data quality and site conditions.
Confirm available signals, product and lot links, operating criteria, approvers and permitted controls. Ingkle experts structure know-how as ontology in NAZARE using field interviews and proprietary tools.



