01 · NAZARE
Connect data
Collect actual temperatures, pressures and cycles with resin lots, mold IDs, setting history and cavity-level inspections.
Short shots or dimensional variations recur despite the same settings. Without resin, mold and actual process records together, adjustments rely on trial and error.

Data connections, decision rules and approved actions are designed for your equipment and operating criteria.
The production flow
01 · NAZARE
Collect actual temperatures, pressures and cycles with resin lots, mold IDs, setting history and cavity-level inspections.
02 · NAZARE · Ontology
Capture mold–cavity–product relationships, approved operating ranges, resin-change checks and defect-specific response sequences.
03 · NAVIS
NAVIS compares current process values with good-production periods. It proposes checks with evidence; a separately developed quality model can be added if needed.
↶ Keep verified outcomes and actions in NAZARE to inform the next decision.
Machine safety circuits, interlocks and operating procedures remain in place. Control requires approval and verified communication, permissions and equipment state. ML models can be added under a separate scope.
Operators
Management & production leads
Establish a baseline and compare under matching product and operating conditions. Outcomes depend on data quality and site conditions.
Confirm available signals, product and lot links, operating criteria, approvers and permitted controls. Ingkle experts structure know-how as ontology in NAZARE using field interviews and proprietary tools.



